What is an example Risk Level in an Inspection?

Introduction

After adding a negative finding, you will need to determine its risk level.

 

How to Select the Risk Level on a Negative Finding

  1. Create an inspection.
  2. Add a negative finding to that inspection, and add a note to that finding.
  3. Doing so will bring you to this screen where you can select risk level:

 

 

How to Identify the Correct Risk Level

When identifying a risk level, consider the likelihood that an injury could occur and the potential severity of the outcome.

  • First Aid Case Only (Low)
  • Recordable Injury (1-5 Lost Days) (Medium)
  • >5 Lost Work Days / Significant Property Damage (High)
  • Potential for Disabling Injury or Fatality (IDLH)